Massachusetts Avenue, Indianapolis
Plan in progress · 2026

The Mass Ave Next Vision Plan is underway.

A year-long, community-driven vision plan for downtown Indianapolis's cultural corridor — led by the Mass Ave Cultural Arts District with funding from the Indianapolis Foundation and planning by Proformus.

About

How does a cultural district stay cultural?

Mass Ave has become downtown Indianapolis's home for arts, culture, food, shopping, and more. But success brings pressure — and without a shared plan, development happens to a district rather than for it. The Mass Ave Next District Vision Plan is a year-long strategic framework process designed to ensure that what makes Mass Ave extraordinary doesn't get lost in what comes next.

Commissioned by the Mass Ave Cultural Arts District (MACAD) in partnership with the Indianapolis Foundation, and led by Proformus, the plan serves as an overlay to the district's existing historic preservation and neighborhood plans — enhancing, not replacing, their foundational work.

The district today is 6,400+ residents strong, with a median household income of $87,000 and a 70+% renter population that is overwhelmingly working-age, educated, and white collar — a place optimized for creatives' consumption but increasingly difficult to afford for the artists, small operators, and independent businesses that built its identity. The vision plan confronts that tension directly.

Study Area

The plan boundary.

The study area covers the Mass Ave Cultural Arts District and its surrounding blocks in the northeast quadrant of downtown Indianapolis — bounded by Ohio Street to the south, Pennsylvania Street and Fort Wayne Avenue to the west, and the Interstate loop of I-65 and I-70 to the north and east.

Massachusetts Avenue itself — one of the four original diagonals of Alexander Ralston's 1821 plan for Indianapolis — runs through the heart of the study area, stitching together the neighborhoods, venues, and main-street blocks that give the district its character. The plan considers the corridor and the fabric around it as one connected system.

Enlarged map of the Mass Ave Next study area

Process

A year-long journey, phase by phase.

The Mass Ave Next Vision Plan follows a year-long timeline that moves from robust public engagement and district-wide inventory through analysis and into the creation of actionable goals, strategies, and recommendations for the corridor's future.

Jan 2026 · Complete Project Launch
Spring–Summer 2026 · Complete Discovery
Summer–Fall 2026 · Current Opportunity Identification
Fall–Winter 2026 · Upcoming Thinking Big
  • Kick off the project and set expectations for the year ahead
  • Assemble stakeholders, advisors, and committees
  • Review existing plans, studies, and district data
  • "Map Your Mass" public kickoff at The Garage (Feb 21)
  • Online survey and community mapping campaign
  • Pop-up events along the Ave and monthly Pop-up with a Planner sessions
  • Existing conditions assessment and district-wide inventory
  • Wrap up discovery and analyze everything the community shared
  • Theme workshops: Land Use, Connectivity, Open Space, and Arts & Experience
  • Translate findings into urban design frameworks and opportunity sites
  • Synthesize strategies and priorities across all four themes
  • Define goals and solidify strategies for the district's next decade
  • Finalize a set of actionable recommendations into the plan
  • Final Reveal at the IF Theatre (Dec 3)
Mass Ave Next project schedule showing phases, engagement events, and milestones across 2026

The full project schedule — engagement events, working sessions, and milestones run continuously across every phase.

Out on the Ave

Engagement in action.

From board rooms to parklets, coffee counters to an 8-foot corridor map — this plan is being built in public, out on the Ave, with the people who live it every day.

Project Goals

Four goals guide everything we do.

Arts and culture on Mass Ave
Goal 01

Create and sustain a vibrant cultural district

Strengthen the arts, venues, small businesses, and public life that make Mass Ave the creative heart of Indianapolis — and build the conditions for them to thrive for decades, not seasons.

The Mass Ave streetscape experience
Goal 02

Match the brand of Mass Ave with the experience

Mass Ave promises "45 Degrees from Ordinary." The plan aligns the on-the-ground experience — streetscape, storefronts, public art, and everyday comfort — with the identity the district projects.

Community engagement in the district
Goal 03

Provide a playbook other cultural districts can follow

Document a repeatable, transferable process — engagement, analysis, and implementation — so what works on Mass Ave can guide cultural districts across Indianapolis and beyond.

Looking ahead on Massachusetts Avenue
Goal 04

Create actionable goals for the long-term health of the district

Move beyond vision language to concrete, fundable, measurable actions — with clear owners, timelines, and next steps the district can start on the day the plan is adopted.

Framework

Strategic themes, guiding themes.

The plan's framework is organized around four strategic themes — the physical systems of the district:

Isometric diagram of land use across the Mass Ave district
Inconsistent investment Activate the market

Land Use

Infill, housing mix, and ground-floor activation — targeting the parcels where value-per-acre lags the rest of the district. Parking, vacant, and underworked land is the district's largest untapped asset, and this framework shows what those sites could become.

What opportunities exist to maximize land use in and around the district — and what do those sites and strategies look like?

Isometric diagram of the district's street, trail, and connection network
Barriers to connect Better connection

Connection

Intersections, trails, and links under the highway — making movement through the district as good as the destination itself. From safer crossings to stronger ties with the neighborhoods around the Ave, connectivity is what stitches the district into the city.

What opportunities exist to make movement through the district as good as the destination?

Isometric diagram of open space and greenspace in the district
Lack of recreation Create play

Open Space

Greenspace, third places, and the public realm — converting underused land into the commons residents asked for. More trees, more places to linger, and more room for everyday life along and around the Ave.

Where are there opportunities to create spaces to positively linger and engage the public realm — for residents and visitors alike?

Isometric diagram mapping arts, culture, and experience across the district
Experience ≠ brand Develop the public realm

Arts and Experience

Cultural folkways and the places that produce them — public art, programming, and performance. This framework maps where arts and cultural activity happens today, where it's missing, and where the lived experience of the district can rise to meet its reputation.

Where does current art and culture take place, and where is it missing? Where does the lived experience differ from expectation?

But the physical is only half the equation. Running alongside them are the guiding themes — the sociophysical layer that asks not just how do we get there but what do our decisions say about who we are?

More than a street guiding theme graphic

More than a street

A dynamic urban village that is accessible, authentic, community oriented, and meets residents' needs.

Stitches the city guiding theme graphic

Stitches the city

A bridge that connects downtown at the nexus of art, culture, livability, and commerce.

Home for all guiding theme graphic

Home for all

Supports a diverse mix of residents, businesses, and cultural offerings that is welcoming to all.

Team

Led by the district, for the district.

Mass Ave Next is led by the Mass Ave Cultural Arts District, funded by the Indianapolis Foundation, with engagement and district strategy led by Proformus.

Get Involved

This plan is built from your input.

Take the survey

The Mass Ave Next Community Vision Survey takes just a few minutes and directly shapes the plan's priorities.

Take the survey

Play the budget simulator

You get one bill of each denomination ($1–$100) to fund different priorities — showing us where the community would put its money first.

Play the simulator

Get email updates

Subscribe to the Mass Ave Next newsletter for progress updates and notifications about upcoming events.

Sign up for emails

Upcoming & recent events

  • Sat, Feb 21 — Public Kickoff, "Map Your Mass" at The Garage (completed)
  • Mon, Mar 2 — Advisory Council Kickoff (completed)
  • Thu, Apr 16, 9–10 AM — Coffee with a Planner at Coat Check Coffee (completed)
  • Tue, May 12 — "Think Inside the Box" Pop-Up Parklet (completed)
  • Wed, May 20 — Barton Towers Community Meeting (completed)
  • Thu, May 21, 9–10 AM — Coffee with a Planner at Coat Check Coffee (completed)
  • Thu, Jun 18, 9–10 AM — Coffee with a Planner at Coat Check Coffee (completed)
  • Thu, Jul 16, 9–10 AM — Coffee with a Planner at Coat Check Coffee (completed)
  • Wed, Aug 12, 3:30 PM — Land Use Workshop (Athenaeum, Wilkie Room)
  • Tue, Aug 18, 3:30 PM — Connectivity Workshop (Athenaeum, Wilkie Room)
  • Mon, Aug 31, 3:30 PM — Open Space Workshop (Athenaeum, Wilkie Room)
  • Mon, Sept 14, 3:30 PM — Arts, Culture & Experience Workshop (Athenaeum, Wilkie Room)
  • Thu, Sept 17, 3:30 PM — Strategies & Priorities Discussion, synthesizing the workshops (location to be determined)
  • Wed, Dec 3 — Final Reveal at the IF Theatre

Subscribe to the public events calendar →

FAQ

Frequently asked questions.

Mass Ave Next is a year-long district vision plan for the Mass Ave Cultural Arts District — a strategic framework that charts the next 5–10 years of the corridor's future through public engagement, spatial analysis, and actionable recommendations.

The plan is led by the Mass Ave Cultural Arts District (MACAD), a 501(c)(3) nonprofit dedicated to preserving and promoting the arts, vibrancy, and heritage of the district, with funding from the Indianapolis Foundation. Proformus, an Indianapolis-based urban planning practice, is leading the engagement and district strategy.

Mass Ave Next serves as an overlay to existing historic preservation and neighborhood plans — enhancing, not replacing, their foundational work. Rather than starting from scratch, it synthesizes what those plans established and focuses on what comes next: implementation, opportunity sites, and the long-term cultural health of the district.

Take the online survey, play the budget simulator, stop by a monthly "Pop-up with a Planner" session at the Athenaeum, or join us at public events along the Ave throughout the year. Every response and conversation directly shapes the plan.

The final plan will be revealed on Wednesday, December 3, 2026 at the IF Theatre, following the Thinking Big phase in fall and winter 2026. Progress updates are posted to the Resources section of this page along the way.

Resources

Project documents.

More documents — engagement summaries, presentation materials, and the draft plan — will be posted here as each phase wraps up.